News for February 2025

1. EMERGENCY PRESS RELEASE Date : February 19, 2025

Period of Interruption : 3:00PM to 9:00PM
Purpose : Repair of leaking 8-inch diameter distribution line UPVC pipe at P3B New ...

2. BCWD ADVISORY: Billing Updates (February 18, 2025 10:00AM)

In March 2025, BCWD will utilize the remaining stock of red bill papers to print current bills and bills with arrears, ...

3. EMERGENCY LEAKAGE REPAIR Date : February 17, 2024

Period of Interruption: 10:00PM (Feb 17, 2025) to 12:00AM (Feb. 18, 2025)
Reason : Repair of leaking 4-inch diameter UPVC pipeline ...

4. ADVISORY: FLUSHING (February 16 - 28, 2025 10:00PM - 4:00AM)

The Butuan City Water District (BCWD) will be conducting flushing activities from 10:00 P.M. to 4:00 A.M at the following areas, ...

5. EMERGENCY PRESS RELEASE Date : February 11, 2025

Period of Interruption : 10:00PM to 12:00MN
Activity : Emergency repair of 2-inch diameter PE Tubing
R e a s o ...

6. WATER SERVICE INTERRUPTION Date: Feb. 01, 2025

Period of Interruption : 10:00PM (Feb 01, 2025) to 6:00AM (Feb. 02, 2025)
R e a s o n : Repair ...

7. ADVISORY: FLUSHING (February 1 - 15, 2025 10:00PM - 4:00AM)

The Butuan City Water District (BCWD) will be conducting flushing activities from 10:00 P.M. to 4:00 A.M at the following areas, ...